Archive Notification
| S. No. | Title | Subject Area | Date | Download/Details |
|---|---|---|---|---|
| 3681 | Encashment of Earned leave alongwith LTC Clarification reg. | Internal Order | 16-02-2015 | Download(1.19 MB) |
| 3682 | Rotation of Staff posted at Sensitive and Non-sensitive Posts-reg. | Internal Order | 11-02-2015 | Download(164.17 KB) |
| 3683 | Organising Special Aadhaar EnrollmentCamp(AECs) for CSIR staff | Internal Order | 09-02-2015 | Download(1.54 MB) |
| 3684 | Introduction of Aadhaar Enabled Biometric AttendanceSystem in CSIR Hq | Internal Order | 09-02-2015 | Download(2.84 MB) |
| 3685 | Project Cost Estimates and mid-term review of cost estimates. | Internal Order | 09-02-2015 | Download(937.78 KB) |
| 3686 | Instructions of the Hon'ble Minister of State for S&T and ES -reg. | Internal Order | 04-02-2015 | Download(390.82 KB) |
| 3687 | Dr. M. O. Garg, has assumed the charge for the post of DG,CSIR - reg | Internal Order | 04-02-2015 | Download(313.28 KB) |
| 3688 | Immediate Suspension of M/S track Pvt. Ltd. CHA -reg. | Internal Order | 03-02-2015 | Download(339.07 KB) |
| 3689 | Assigning charge of post of DG, CSIR to Dr. M.O. Garg, Director, CSIR-IIP | Internal Order | 02-02-2015 | Download(839.46 KB) |
| 3690 | ERP Implementation - CSIR CIMAP | Internal Order | 27-01-2015 | Download(3.56 MB) |

Skip to main content


